Description of construction

     Design work on new construction of the office building with underground stand are executed under the direction of Leonova M.G.; the main architect of the project SHkaeva N.P.; the main engineer of the project Kiseleva I.M.

     The multifunctional administrative building has 25 floors by overland area 13763,2 kv.m., with 4-stage underground stand on 160 cars. Entry in office part of building is provided with corner of the building (on the part of cross streets Lefortovskiy gross and journey zavod Serp i Molot). Platform is provided On roof of the building for booth transport-resque helicopter.

 

 

 
     The Multifunctional administrative building with underground stand by general area 18317 kv.m. are intended for accomodation of the offices of long stay representation commercial companies in g.Moscow. In this connection building with 4 on 25 floors has division on autonomous offices with free planning. The restaurant takes seats On the street floors, but on second and one third floor trade-exhibition area. The building is located on crossing the streets Lefortovskiy gross and journey of the plant Serp and Molot and is angular majority. The building`s place is located in 200-h metre from the third transport ring Moscow, in close proximity history centre of the capital. The Transport pathways allow achive for 10-15 minutes before flint. On foot on nearest station metro Aviamotornaya or Ploschad Iliicha possible reach for 10 minutes.
     The Building is located on crossing the streets Lefortovskiy gross and journey of the plant Sickle and Hammer and is angular доминантой. The Place застройки is located in 200-h metre from выезда-въезда on the third transport ring Moscow, in close proximity history centre of the capital. The Transport pathways allow доехать for 10-15 minutes before Flint. On foot on nearest station metro Aviamotornaya or Area Iliicha possible reach for 10 minutes.

Constructive decisions

     The construction is executed monolithic pour with using escalated constructive material, providing high quakesafety. The foundations - monolithic plate from concrete of the mark In 25. The design foundation is executed in accordance with given on engineering-geological condition of the area. The medicine to be taken externally wall underground part - monolithic from concrete of the mark In 25 thicknesses 300 mms, with efficient warming on depth of freeze from polisterol Stirodur 2800 with = 28 kg/m3. The framework - a pillars monolithic sections 800х800, 600х600, 400х400 mm from concrete of the mark In 25. The diaphragms to acerbity (the wall lifting mines and stair hutches) by thickness 200 mms - monolithic blocks from concrete of the mark In 25. The degree fireproof - I. Overlappings - monolithic blocks from concrete In 25 thicknesses 220 mms , 300 mms, 1 000 mm. Wall of the elevated part - a medicine to be taken externally wall elevated part monolithic blocks from concrete of the mark In 25 thicknesses 200 mms with efficient warming hard plate Rockwool Polska SP.ZO.O marks Facad Battc = 150 kg/m3 thickness 150 mms and medicine to be taken externally decorative layer. The stairways - monolithic block from concrete of the mark In 25. The partitons- in cellar of the partiton are executed from red brick, in elevated part on metallic framework. In premiseses with special requirements of the partiton with additional soundproof. The roofing flat, combined, ventilated with internal storm water; tilted - combined, ventilated with organized by storm water. The general stability - is provided by collaboration sewer to acerbity and disk overlapping.